Settings8H · net · $10k
LanguageThe language of the site
ThemeDark, or a soft blue-grey
FundingPeriod funding rates are shown in
UnitsPercent or basis points
CostsCount taker fees and slippage in Net
SizePosition per leg used for Net and slippage
ExchangesWhich exchanges to include everywhere
My profile →
My profile

Perp DEX charts

Volume by exchange

$10.12B↘ 53.8% since Sep 18

Reset
Oct 24, 2026Share
  1. Total$10.12B
Table
DayHyperliquidtradeXYZVariational OmniLighterAsterKalshiPacificaLighter RHTotal
Oct 24, 2026$4.76B$480.7M$769.5M$1.49B$1.05B$580.7M$518.4M$469.7M$10.12B
Oct 23, 2026$4.33B$3.03B$2.38B$1.56B$1.72B$934.4M$873.9M$665.8M$15.49B
Oct 22, 2026$6.73B$3.73B$2.59B$2.34B$1.89B$887.5M$848.4M$799.9M$19.82B
Oct 21, 2026$5.13B$3.65B$3.57B$1.90B$1.74B$1.21B$784.5M$819.6M$18.79B
Oct 20, 2026$5.65B$3.61B$3.37B$2.27B$1.67B$1.10B$886.4M$717.2M$19.28B
Oct 19, 2026$4.26B$3.41B$3.02B$1.98B$1.42B$987.8M$822.0M$633.3M$16.54B
Oct 18, 2026$4.38B$1.22B$1.02B$1.68B$951.1M$516.7M$469.1M$478.8M$10.71B
Oct 17, 2026$2.42B$849.3M$767.7M$972.2M$623.7M$330.4M$368.3M$407.5M$6.74B
Oct 16, 2026$5.77B$3.47B$3.20B$2.00B$1.54B$1.06B$787.4M$722.3M$18.56B
Oct 15, 2026$9.03B$4.61B$3.13B$2.12B$2.62B$922.8M$989.9M$774.4M$24.20B
Oct 14, 2026$6.25B$4.06B$3.90B$2.05B$2.13B$1.15B$981.3M$686.5M$21.21B
Oct 13, 2026$6.31B$2.97B$3.46B$1.78B$2.13B$942.1M$885.9M$656.0M$19.14B
Oct 12, 2026$6.29B$2.35B$3.58B$1.68B$2.03B$910.9M$731.8M$687.2M$18.26B
Oct 11, 2026$3.62B$455.6M$1.20B$1.13B$886.6M$246.1M$309.0M$419.2M$8.27B
Oct 10, 2026$2.79B$220.2M$925.9M$996.3M$573.8M$267.2M$247.5M$386.5M$6.41B
Oct 9, 2026$4.04B$1.93B$2.31B$1.60B$1.43B$873.4M$798.7M$590.8M$13.57B
Oct 8, 2026$9.40B$3.20B$3.40B$2.73B$2.92B$847.3M$1.04B$761.2M$24.31B
Oct 7, 2026$6.80B$2.37B$4.00B$2.40B$1.93B$722.4M$827.6M$725.9M$19.77B
Oct 6, 2026$4.07B$2.17B$4.40B$1.65B$1.42B$576.8M$661.0M$576.7M$15.53B
Oct 5, 2026$5.75B$2.01B$3.84B$1.50B$1.72B$779.0M$774.9M$623.8M$17.00B
Oct 4, 2026$2.79B$374.3M$1.04B$771.6M$867.3M$357.3M$340.1M$377.2M$6.92B
Oct 3, 2026$1.95B$256.4M$895.9M$525.2M$790.5M$218.8M$270.4M$352.2M$5.26B
Oct 2, 2026$8.15B$2.40B$4.11B$1.70B$2.50B$1.04B$943.0M$674.0M$21.53B
Oct 1, 2026$5.63B$2.72B$2.73B$1.50B$1.69B$882.4M$856.5M$587.1M$16.60B
Sep 30, 2026$7.07B$2.25B$3.52B$1.71B$1.90B$1.08B$678.9M$593.3M$18.79B
Sep 29, 2026$6.66B$2.21B$3.51B$1.61B$1.62B$1.10B$817.9M$511.3M$18.04B
Sep 28, 2026$7.81B$3.44B$3.49B$1.76B$1.76B$1.30B$977.3M$622.2M$21.17B
Sep 27, 2026$4.05B$595.2M$1.28B$822.7M$875.8M$459.7M$443.9M$350.2M$8.87B
Sep 26, 2026$2.98B$373.5M$878.6M$639.2M$784.8M$304.3M$348.1M$296.3M$6.61B
Sep 25, 2026$7.15B$2.07B$2.66B$1.54B$1.48B$1.22B$747.1M$518.7M$17.38B
Sep 24, 2026$8.59B$2.62B$3.22B$1.76B$1.80B$1.47B$762.4M$524.5M$20.75B
Sep 23, 2026$9.86B$2.20B$4.04B$1.98B$2.18B$1.27B$912.2M$554.1M$23.00B
Sep 22, 2026$7.02B$2.72B$3.70B$1.50B$1.83B$1.56B$956.6M$514.8M$19.79B
Sep 21, 2026$11.01B$2.64B$3.75B$2.09B$3.38B$1.64B$1.02B$650.9M$26.17B
Sep 20, 2026$5.23B$671.7M$1.24B$1.09B$1.69B$487.6M$185.2M$372.7M$10.96B
Sep 19, 2026$4.36B$337.6M$1.00B$942.6M$1.59B$511.6M$353.6M$298.9M$9.40B
Sep 18, 2026$8.90B$2.14B$2.81B$2.08B$3.36B$1.33B$820.2M$469.6M$21.90B
Sep 17, 2026$5.34B$2.09B$1.68B$1.24B$2.02B—$827.8M$365.2M$13.56B
Sep 16, 2026$6.65B$2.34B$2.14B$1.71B$2.20B—$1.02B$438.4M$16.49B
Sep 15, 2026$9.95B$2.22B$1.74B$1.78B$3.47B—$788.3M$454.6M$20.40B
Sep 14, 2026$6.51B$3.05B$2.05B$2.04B$2.68B—$843.9M$505.1M$17.67B
Sep 13, 2026$3.30B$1.17B$739.3M$876.2M$1.28B—$326.9M$268.6M$7.96B
Sep 12, 2026$1.70B$328.4M$576.0M$533.2M$932.2M—$250.4M$338.7M$4.66B
Sep 11, 2026$8.74B$2.42B$1.96B$1.89B$3.15B—$1.04B$430.8M$19.63B
Sep 10, 2026$5.76B$3.01B$1.41B$1.35B$2.11B—$826.8M$353.7M$14.82B
Sep 9, 2026$6.61B$2.71B$1.96B$1.46B$1.98B—$806.0M$412.7M$15.95B
Sep 8, 2026$5.12B$3.00B$1.94B$1.17B$1.79B—$828.1M$371.7M$14.21B
Sep 7, 2026$4.05B$1.18B$1.44B$890.3M$4.54B—$738.4M$306.8M$13.15B
Sep 6, 2026$3.74B$506.5M$727.1M$814.3M$1.71B—$403.5M$277.5M$8.18B
Sep 5, 2026$2.39B$312.1M$518.8M$594.5M$2.00B—$338.5M$192.8M$6.35B
Sep 4, 2026$6.57B$2.56B$1.51B$1.40B$3.42B—$718.4M$329.2M$16.51B
Sep 3, 2026$8.34B$2.68B$1.53B$1.65B$3.03B—$898.0M$323.8M$18.46B
Sep 2, 2026$5.40B$2.27B$1.15B$1.16B$2.50B—$853.0M$237.8M$13.56B
Sep 1, 2026$5.76B$2.67B$1.01B$1.78B$2.16B—$909.1M$317.2M$14.61B
Aug 31, 2026$5.68B$2.37B$926.8M$1.49B$1.75B—$869.7M$278.6M$13.37B
Aug 30, 2026$4.71B$853.4M$851.6M$1.29B$1.37B—$397.4M$214.7M$9.68B
Aug 29, 2026$2.32B$226.2M$495.9M$729.1M$591.2M—$317.8M$156.2M$4.84B
Aug 28, 2026$8.89B$2.61B$1.11B$1.47B$2.58B—$950.1M$246.4M$17.86B
Aug 27, 2026$8.66B$2.93B$1.11B$1.51B$2.02B—$1.06B$267.0M$17.55B
Aug 26, 2026$6.83B$2.68B$1.03B$1.29B$1.60B—$1.04B$247.2M$14.72B
Aug 25, 2026$10.44B$2.65B$2.08B$3.08B$2.55B—$1.30B$271.7M$22.38B
Aug 24, 2026$9.78B$3.15B$1.25B$2.04B$2.65B—$1.34B$255.6M$20.46B
Aug 23, 2026$6.99B$661.1M$880.8M$1.36B$666.5M—$707.6M$207.7M$11.48B
Aug 22, 2026$10.01B$408.9M$1.32B$1.48B$1.84B—$817.3M$238.2M$16.11B
Aug 21, 2026$16.16B$3.14B$1.74B$2.77B$5.56B—$1.44B$327.7M$31.13B
Aug 20, 2026$9.57B$3.58B$1.54B$1.99B$3.36B—$1.22B$291.7M$21.55B
Aug 19, 2026$12.53B$5.23B$1.88B$2.20B$3.72B—$836.1M$368.7M$26.77B
Aug 18, 2026$2.65B$3.99B$1.01B$923.1M$1.05B—$418.2M$272.2M$10.31B
Aug 17, 2026$3.13B$3.48B$1.10B$1.06B$1.37B—$520.7M$266.4M$10.92B
Aug 16, 2026$1.23B$302.9M$489.7M$442.3M$379.1M—$144.1M$260.6M$3.25B
Aug 15, 2026$734.1M$285.4M$411.8M$368.9M$277.9M—$111.9M$322.4M$2.51B
Aug 14, 2026$2.21B$3.35B$840.1M$896.9M$898.0M—$612.1M$146.9M$8.95B
Aug 13, 2026$3.08B$4.14B$853.5M$1.17B$1.06B—$545.3M$70.9M$10.92B
Aug 12, 2026$2.92B$3.59B$914.6M$1.15B$1.35B—$498.8M$4.7M$10.42B
Aug 11, 2026$2.44B$2.81B$791.8M$1.04B$1.04B—$444.0M$2.0M$8.57B
Aug 10, 2026$3.03B$3.27B$830.4M$1.06B$1.19B—$528.3M$3.1M$9.91B
Aug 9, 2026$1.36B$652.1M$471.7M$515.9M$563.2M—$175.4M$2.8M$3.74B
Aug 8, 2026$976.9M$480.2M$528.3M$360.9M$304.5M—$106.7M$2.3M$2.76B
Aug 7, 2026$2.99B$4.27B$815.5M$1.11B$1.06B—$606.7M$1.8M$10.86B
Aug 6, 2026$2.52B$4.53B$744.3M$972.1M$1.01B—$582.0M$2.8M$10.36B
Aug 5, 2026$3.55B$5.24B$875.8M$1.20B$1.45B—$653.9M$3.5M$12.98B
Aug 4, 2026$3.18B$6.10B$864.4M$1.11B$1.29B—$691.0M$3.3M$13.24B
Aug 3, 2026$2.98B$4.73B$807.1M$1.16B$1.85B—$570.7M$4.0M$12.11B
Aug 2, 2026$2.13B$1.43B$593.7M$729.0M$1.34B—$361.2M$5.7M$6.59B
Aug 1, 2026$1.45B$511.5M$545.2M$504.8M$609.8M—$251.0M$3.3M$3.87B
Jul 31, 2026$3.77B$6.93B$795.3M$1.33B$1.83B—$762.3M$4.5M$15.42B
Jul 30, 2026$2.62B$7.66B$895.2M$1.31B$1.31B—$772.4M$4.6M$14.58B
Jul 29, 2026$4.31B$8.95B$1.04B$1.75B$2.37B—$900.2M$7.8M$19.33B
Jul 28, 2026$3.81B$6.10B$891.8M$1.44B$1.82B—$675.5M$3.1M$14.73B
Jul 27, 2026$3.88B$5.45B$959.2M$1.50B$1.60B—$799.1M$7.5M$14.20B
Jul 26, 2026$1.72B$996.0M$671.0M$923.4M$784.8M—$308.1M$1.1M$5.40B
Jul 25, 2026$1.27B$554.1M$497.9M$845.9M$554.3M—$223.1M$1.3M$3.94B
Jul 24, 2026$3.51B$4.17B$786.6M$1.10B$1.44B—$765.9M$1.9M$11.79B
Jul 23, 2026$3.26B$5.49B$764.7M$1.17B$1.32B—$739.4M$3.2M$12.76B
Jul 22, 2026$3.76B$4.36B$912.6M$1.32B$1.22B—$713.9M$1.9M$12.29B
Jul 21, 2026$3.71B$3.67B$937.3M$1.24B$1.29B—$780.7M$1.5M$11.63B
Jul 20, 2026$4.56B$3.70B$998.8M$1.41B$1.53B—$984.1M$2.8M$13.18B
Jul 19, 2026$1.67B$911.6M$533.9M$714.6M$526.1M—$355.5M$2.1M$4.71B
Jul 18, 2026$1.54B$531.9M$559.8M$611.7M$529.2M—$264.7M$2.4M$4.04B
Jul 17, 2026$3.74B$5.44B$883.6M$1.30B$1.52B—$836.8M$2.1M$13.73B
Jul 16, 2026$3.64B$4.27B$773.3M$1.21B$1.33B—$738.6M$3.0M$11.96B
Jul 15, 2026$3.64B$4.45B$768.3M$1.04B$1.39B—$718.8M$1.7M$12.01B
Jul 14, 2026$4.67B$5.30B$901.1M$1.60B$1.63B—$795.0M$837K$14.90B
Jul 13, 2026$4.95B$4.61B$939.6M$1.26B$1.71B—$921.2M$3.1M$14.40B
Jul 12, 2026$1.82B$820.9M$680.0M$608.2M$721.2M—$395.9M$3.8M$5.05B
Jul 11, 2026$1.78B$453.0M$648.0M$584.4M$643.1M—$278.3M$2.3M$4.39B
Jul 10, 2026$3.41B$3.59B$768.9M$1.05B$1.14B—$774.1M$3.2M$10.73B
Jul 9, 2026$3.19B$3.79B$776.7M$1.01B$1.16B—$955.8M$2.1M$10.88B
Jul 8, 2026$4.03B$4.75B$960.6M$1.38B$1.37B—$990.1M$1.8M$13.49B
Jul 7, 2026$4.11B$3.37B$960.3M$1.33B$1.56B—$756.8M$1.6M$12.09B
Jul 6, 2026$5.19B$2.55B$917.5M$1.37B$1.85B—$863.2M$2.8M$12.74B
Jul 5, 2026$2.34B$439.9M$648.3M$752.3M$983.1M—$486.3M$1.5M$5.65B
Jul 4, 2026$2.76B$247.9M$617.3M$788.8M$1.08B—$506.9M$1.0M$6.00B
Jul 3, 2026$3.56B$1.58B$712.4M$942.4M$1.41B—$896.4M$3.3M$9.11B
Jul 2, 2026$5.29B$4.09B$1.01B$1.40B$1.94B—$920.2M$1.3M$14.66B
Jul 1, 2026$5.85B$3.45B$1.16B$1.67B$1.85B—$944.0M$529K$14.92B
Jun 30, 2026$4.21B$2.47B$925.8M$1.51B$1.35B—$827.2M$7K$11.29B
Jun 29, 2026$4.57B$3.12B$1.04B$1.58B$1.58B—$1.10B—$12.98B
Jun 28, 2026$2.28B$710.8M$672.2M$853.9M$782.1M—$442.3M—$5.75B
Jun 27, 2026$1.97B$356.2M$579.2M$701.4M$682.1M—$343.7M—$4.63B
Jun 26, 2026$5.90B$3.46B$911.3M$1.64B$1.89B—$1.11B—$14.92B
Jun 25, 2026$6.83B$3.61B$1.15B$1.92B$2.23B—$1.17B—$16.92B
Jun 24, 2026$6.31B$4.09B$1.00B$2.01B$2.31B—$923.6M—$16.65B
Jun 23, 2026$5.30B$4.71B$733.8M$1.32B$1.64B—$911.6M—$14.63B
Jun 22, 2026$5.69B$3.35B$761.6M$1.42B$1.59B—$983.6M—$13.79B
Jun 21, 2026$2.75B$705.7M$578.5M$787.3M$990.3M—$358.2M—$6.17B
Jun 20, 2026$2.42B$423.2M$503.4M$753.1M$1.23B—$504.8M—$5.83B
Jun 19, 2026$3.34B$1.17B$663.1M$1.05B$1.32B—$764.0M—$8.32B
Jun 18, 2026$5.96B$3.37B$869.6M$1.83B$2.41B—$947.3M—$15.38B
Jun 17, 2026$6.12B$3.59B$1.02B$2.13B$2.69B—$1.10B—$16.65B
Jun 16, 2026$5.27B$3.88B$952.7M$1.36B$1.55B—$904.7M—$13.92B
Jun 15, 2026$5.16B$3.12B$892.5M$1.38B$2.05B—$817.9M—$13.43B
Jun 14, 2026$4.07B$1.15B$578.8M$928.7M$1.19B—$448.3M—$8.36B
Jun 13, 2026$2.32B$483.2M$443.3M$677.1M$769.9M—$405.3M—$5.10B
Jun 12, 2026$4.65B$4.46B$780.1M$1.26B$1.26B—$982.2M—$13.40B
Jun 11, 2026$5.39B$4.28B$855.6M$1.53B$1.92B—$876.5M—$14.84B
Jun 10, 2026$6.14B$4.39B$891.7M$1.62B$2.08B—$1.13B—$16.26B
Jun 9, 2026$6.40B$4.57B$880.1M$1.68B$3.06B—$1.15B—$17.74B
Jun 8, 2026$6.01B$3.57B$759.2M$1.67B$1.91B—$1.22B—$15.14B
Jun 7, 2026$5.84B$1.18B$785.9M$1.71B$2.01B—$531.1M—$12.06B
Jun 6, 2026$5.64B$746.7M$689.5M$1.04B$1.95B—$482.9M—$10.55B
Jun 5, 2026$15.87B$3.97B$1.62B$2.91B$4.58B—$1.12B—$30.08B
Jun 4, 2026$12.59B$2.85B$1.52B$2.75B$4.03B—$1.11B—$24.85B
Jun 3, 2026$9.58B$2.61B$1.24B$2.04B$3.21B—$929.6M—$19.60B
Jun 2, 2026$11.25B$2.42B$1.49B$2.26B$3.46B—$1.09B—$21.97B
Jun 1, 2026$7.52B$2.64B$1.33B$1.76B$2.48B—$1.17B—$16.90B
May 31, 2026$3.57B$489.8M$711.4M$844.2M$1.20B—$530.8M—$7.35B
May 30, 2026$2.83B$288.8M$631.1M$715.8M$1.05B—$501.5M—$6.02B
May 29, 2026$5.59B$2.11B$955.2M$1.45B$1.60B—$956.1M—$12.66B
May 28, 2026$5.97B$2.33B$1.16B$1.62B$1.89B—$1.09B—$14.05B
May 27, 2026$4.70B$2.72B$936.3M$1.36B$1.42B—$1.14B—$12.28B
May 26, 2026$5.80B$2.01B$938.2M$1.43B$1.73B—$439.5M—$12.35B
May 25, 2026$3.09B$1.23B$604.6M$872.9M$897.8M—$546.4M—$7.25B
May 24, 2026$3.91B$865.7M$677.3M$894.8M$1.23B—$410.0M—$7.98B
May 23, 2026$5.46B$1.17B$837.0M$1.20B$1.68B—$458.7M—$10.81B
May 22, 2026$5.30B$2.11B$867.9M$1.34B$1.39B—$714.6M—$11.72B
May 21, 2026$6.03B$3.01B$911.4M$1.38B$1.59B—$915.3M—$13.84B
May 20, 2026$4.20B$2.85B$797.9M$1.36B$1.21B—$959.4M—$11.38B
May 19, 2026$3.19B$2.61B$615.8M$1.27B$1.29B—$923.3M—$9.90B
May 18, 2026$5.26B$3.22B$716.7M$1.70B$2.15B—$1.13B—$14.17B
May 17, 2026$3.42B$437.2M$459.7M$961.3M$1.10B—$541.0M—$6.92B
May 16, 2026$3.08B$272.5M$502.4M$775.4M$1.06B—$492.1M—$6.18B
May 15, 2026$5.05B$2.72B$658.7M$1.47B$1.87B—$786.3M—$12.55B
May 14, 2026$5.22B$2.56B$645.2M$1.65B$1.93B—$973.6M—$12.98B
May 13, 2026$4.00B$2.16B$761.9M$1.59B$1.79B—$949.9M—$11.27B
May 12, 2026$3.61B$2.23B$603.8M$1.32B$1.44B—$952.2M—$10.16B
May 11, 2026$4.23B$2.33B$649.5M$1.17B$1.44B—$946.7M—$10.76B
May 10, 2026$3.63B$771.1M$504.4M$911.4M$1.42B—$499.9M—$7.74B
May 9, 2026$2.40B$273.4M$371.8M$746.4M$939.4M—$442.7M—$5.17B
May 8, 2026$4.05B$2.24B$527.4M$1.29B$1.51B—$934.8M—$10.55B
May 7, 2026$4.59B$3.41B$513.1M$1.57B$1.83B—$863.8M—$12.77B
May 6, 2026$5.62B$3.36B$700.3M$1.83B$2.06B—$1.09B—$14.66B
May 5, 2026$4.76B$2.20B$621.1M$1.59B$1.84B—$998.1M—$12.01B
May 4, 2026$5.88B$3.08B$649.0M$1.93B$2.69B—$960.7M—$15.19B
May 3, 2026$2.21B$635.8M$323.2M$882.7M$885.6M—$452.2M—$5.39B
May 2, 2026$1.65B$192.9M$295.6M$681.3M$716.1M—$379.8M—$3.91B
May 1, 2026$3.82B$2.16B$532.6M$1.26B$1.53B—$853.3M—$10.15B
Apr 30, 2026$3.55B$2.64B$410.4M$1.05B$1.23B—$792.8M—$9.66B
Apr 29, 2026$4.78B$2.72B$719.8M$1.48B$2.14B—$841.8M—$12.68B
Apr 28, 2026$3.36B$2.23B$553.3M$1.29B$1.24B—$579.1M—$9.25B
Apr 27, 2026$3.97B$1.51B$675.4M$1.50B$1.79B—$644.6M—$10.09B
Apr 26, 2026$2.07B$464.0M$379.8M$794.1M$1.09B—$376.6M—$5.17B
Apr 25, 2026$1.31B$287.3M$278.1M$543.2M$613.7M—$266.6M—$3.30B
Apr 24, 2026$3.18B$2.02B$520.8M$1.19B$1.43B—$794.4M—$9.14B
Apr 23, 2026$4.90B$2.47B$573.5M$1.38B$1.95B—$857.0M—$12.13B
Apr 22, 2026$4.78B$1.68B$678.4M$1.51B$2.06B—$734.6M—$11.44B
Apr 21, 2026$4.93B$2.37B$526.2M$1.42B$2.00B—$898.3M—$12.14B
Apr 20, 2026$4.01B$1.93B$499.4M$1.49B$2.05B—$949.9M—$10.93B
Apr 19, 2026$4.11B$1.02B$409.8M$1.30B$1.78B—$488.6M—$9.11B
Apr 18, 2026$2.61B$637.2M$307.8M$802.2M$1.34B—$393.0M—$6.10B
Apr 17, 2026$5.70B$2.48B$680.7M$1.82B$2.55B—$851.3M—$14.08B
Apr 16, 2026$5.02B$1.64B$696.9M$1.54B$1.91B—$940.4M—$11.75B
Apr 15, 2026$3.97B$1.92B$426.9M$1.40B$1.61B—$884.9M—$10.21B
Apr 14, 2026$5.57B$2.09B$681.3M$1.65B$1.97B—$788.7M—$12.75B
Apr 13, 2026$5.29B$2.49B$505.0M$1.80B$2.32B—$933.7M—$13.34B
Apr 12, 2026$3.42B$1.84B$394.2M$946.7M$1.54B—$489.0M—$8.63B
Apr 11, 2026$2.21B$493.4M$304.0M$927.5M$1.03B—$435.3M—$5.40B
Apr 10, 2026$3.85B$1.82B$458.5M$1.29B$1.62B—$550.1M—$9.59B
Apr 9, 2026$5.10B$3.10B$531.9M$1.88B$1.98B—$830.3M—$13.42B
Apr 8, 2026$5.00B$4.47B$524.6M$1.80B$2.09B—$927.2M—$14.80B
Apr 7, 2026$6.45B$4.98B$682.4M$2.26B$2.71B—$797.3M—$17.88B
Apr 6, 2026$4.54B$2.47B$536.1M$1.85B$1.82B—$851.1M—$12.07B
Apr 5, 2026$2.44B$663.9M$348.2M$958.1M$1.32B—$406.6M—$6.14B
Apr 4, 2026$1.18B$191.6M$240.7M$566.0M$756.8M—$207.4M—$3.14B
Apr 3, 2026$2.37B$422.1M$357.3M$766.2M$1.08B—$452.0M—$5.45B
Apr 2, 2026$5.18B$3.96B$517.7M$2.02B$2.20B—$765.5M—$14.65B
Apr 1, 2026$4.92B$2.96B$592.6M$1.56B$1.99B—$846.8M—$12.86B
Mar 31, 2026$6.11B$3.27B$598.6M$2.26B$2.71B—$871.1M—$15.81B
Mar 30, 2026$3.79B$2.04B$645.0M$1.80B$2.28B—$752.0M—$11.31B
Mar 29, 2026$2.14B$566.0M$425.4M$953.4M$1.42B—$420.7M—$5.93B
Mar 28, 2026$1.97B$335.5M$417.8M$709.8M$1.15B—$382.7M—$4.97B
Mar 27, 2026$4.02B$2.05B$588.5M$1.71B$2.14B—$748.7M—$11.26B
Mar 26, 2026$4.41B$2.16B$515.2M$1.60B$2.19B—$755.7M—$11.63B
Mar 25, 2026$4.53B$2.22B$630.2M$1.95B$1.96B—$659.5M—$11.95B
Mar 24, 2026$4.59B$3.06B$719.7M$1.98B$2.50B—$879.9M—$13.73B
Mar 23, 2026$6.49B$5.22B$920.6M$2.41B$3.66B—$967.9M—$19.67B
Mar 22, 2026$4.04B$792.4M$556.5M$1.35B$2.27B—$526.5M—$9.54B
Mar 21, 2026$1.77B$310.5M$299.9M$768.3M$1.16B—$276.8M—$4.58B
Mar 20, 2026$4.34B$1.98B$874.7M$1.58B$2.73B—$854.1M—$12.35B
Mar 19, 2026$5.73B$3.52B$712.0M$1.81B$3.05B—$869.6M—$15.68B
Mar 18, 2026$6.01B$2.09B$820.9M$2.45B$3.38B—$702.1M—$15.45B
Mar 17, 2026$5.55B$1.13B$798.0M$1.79B$2.87B—$954.8M—$13.10B
Mar 16, 2026$6.51B$1.69B$1.06B$2.41B$3.33B—$1.08B—$16.07B
Mar 15, 2026$2.91B$806.5M$542.5M$1.15B$1.93B—$443.0M—$7.78B
Mar 14, 2026$1.91B$538.3M$356.5M$764.2M$1.67B—$244.5M—$5.49B
Mar 13, 2026$5.86B$1.81B$1.03B$2.83B$3.69B—$975.3M—$16.20B
Mar 12, 2026$4.17B$2.44B$686.6M$1.74B$2.31B—$946.0M—$12.30B
Mar 11, 2026$4.34B$2.06B$857.8M$1.82B$2.39B—$892.7M—$12.36B
Mar 10, 2026$5.27B$2.34B$1.13B$2.23B$2.97B—$953.9M—$14.89B
Mar 9, 2026$6.14B$3.56B$887.3M$2.17B$2.67B—$1.12B—$16.54B
Mar 8, 2026$3.69B$728.3M$602.3M$1.60B$1.75B—$517.7M—$8.88B
Mar 7, 2026$2.43B$365.0M$469.8M$1.05B$1.08B—$364.5M—$5.76B
Mar 6, 2026$5.65B$1.84B$870.3M$2.39B$2.46B—$890.2M—$14.11B
Mar 5, 2026$5.12B$1.75B$838.2M$2.09B$2.63B—$903.6M—$13.34B
Mar 4, 2026$7.68B$1.96B$1.23B$3.06B$3.86B—$883.1M—$18.68B
Mar 3, 2026$6.16B$2.90B$1.32B$2.30B$2.63B—$717.7M—$16.04B
Mar 2, 2026$6.21B$1.86B$1.45B$2.30B$3.11B—$731.4M—$15.66B
Mar 1, 2026$4.49B$482.1M$1.05B$2.54B$2.66B—$407.2M—$11.63B
Feb 28, 2026$5.82B$601.0M$1.01B$2.31B$3.03B—$382.1M—$13.16B
Feb 27, 2026$4.01B$1.06B$1.13B$2.12B$2.45B—$628.7M—$11.39B
Feb 26, 2026$4.49B$1.28B$995.1M$2.02B$2.26B—$685.0M—$11.74B
Feb 25, 2026$6.74B$1.54B$1.43B$3.66B$3.74B—$566.5M—$17.68B
Feb 24, 2026$4.82B$1.22B$1.25B$3.05B$2.22B—$513.4M—$13.07B
Feb 23, 2026$5.36B$1.00B$1.32B$2.77B$2.99B—$621.5M—$14.07B
Feb 22, 2026$1.51B$261.4M$661.6M$1.69B$1.01B—$253.2M—$5.38B
Feb 21, 2026$1.47B$139.8M$624.3M$1.24B$966.1M—$174.1M—$4.61B
Feb 20, 2026$4.45B$1.23B$968.8M$2.15B$2.51B—$630.4M—$11.92B
Feb 19, 2026$3.31B$763.8M$942.7M$1.46B$2.12B—$633.7M—$9.23B
Feb 18, 2026$3.84B$657.9M$1.18B$1.97B$2.38B—$640.8M—$10.67B
Feb 17, 2026$4.13B$1.04B$1.19B$2.40B$2.26B—$603.5M—$11.61B
Feb 16, 2026$3.17B$324.9M$970.4M$2.23B$2.31B—$645.6M—$9.65B
Feb 15, 2026$3.28B$169.4M$903.4M$2.04B$2.58B—$333.7M—$9.30B
Feb 14, 2026$2.49B$66.5M$760.0M$1.28B$1.61B—$288.9M—$6.49B
Feb 13, 2026$4.11B$1.12B$748.1M$1.91B$2.77B—$641.3M—$11.29B
Feb 12, 2026$4.82B$1.45B$706.9M$1.99B$2.82B—$651.0M—$12.45B
Feb 11, 2026$5.90B$1.09B$864.9M$2.23B$3.55B—$913.4M—$14.55B
Feb 10, 2026$4.78B$879.8M$625.5M$1.80B$2.95B—$865.5M—$11.90B
Feb 9, 2026$5.27B$1.12B$767.9M$2.20B$3.66B—$850.5M—$13.86B
Feb 8, 2026$3.55B$197.3M$611.3M$1.72B$2.54B—$856.3M—$9.47B
Feb 7, 2026$6.17B$91.5M$669.6M$2.46B$4.51B—$824.3M—$14.72B
Feb 6, 2026$13.84B$2.64B$977.6M$4.34B$8.22B—$891.0M—$30.91B
Feb 5, 2026$19.30B$4.55B$1.30B$7.46B$9.87B—$958.0M—$43.44B
Feb 4, 2026$10.06B$2.31B$979.7M$3.98B$5.38B—$957.6M—$23.66B
Feb 3, 2026$10.24B$2.26B$1.10B$4.40B$5.67B—$804.6M—$24.46B
Feb 2, 2026$8.31B$2.92B$965.0M$4.37B$5.98B—$936.5M—$23.48B
Feb 1, 2026$7.54B$428.8M$907.6M$3.99B$4.66B—$906.8M—$18.44B
Jan 31, 2026$12.50B$352.8M$1.07B$4.51B$6.25B—$812.0M—$25.50B
Jan 30, 2026$10.57B$4.24B$987.3M$4.95B$6.68B—$900.6M—$28.34B
Jan 29, 2026$11.35B$2.88B$1.27B$4.90B$6.22B—$808.4M—$27.42B
Jan 28, 2026$7.12B$1.96B$1.20B$3.92B$4.05B—$808.7M—$19.06B
Jan 27, 2026$5.13B$1.60B$1.12B$3.85B$2.17B—$696.0M—$14.56B
Jan 26, 2026$5.46B$1.51B$1.14B$4.13B$3.03B—$655.8M—$15.93B
Jan 25, 2026$5.38B$342.2M$1.12B$3.06B$3.75B—$670.6M—$14.33B
Jan 24, 2026$1.24B$153.4M$896.2M$1.12B$1.31B—$291.3M—$5.01B
Jan 23, 2026$6.03B$745.5M—$3.37B$3.01B—$827.1M—$13.98B
Jan 22, 2026$5.10B$818.3M—$3.71B$3.77B—$721.2M—$14.12B
Jan 21, 2026$8.89B$843.1M—$5.00B$6.04B—$905.6M—$21.68B
Jan 20, 2026$8.18B$669.6M—$4.86B$6.01B—$893.5M—$20.61B
Jan 19, 2026$5.81B$343.4M—$3.24B$3.99B—$862.7M—$14.25B
Jan 18, 2026$2.55B$148.4M—$2.20B$2.15B—$596.7M—$7.65B
Jan 17, 2026$1.54B$149.1M—$1.63B$1.86B—$357.0M—$5.54B
Jan 16, 2026$3.57B$469.9M—$3.27B$3.72B—$749.5M—$11.77B
Jan 15, 2026$6.40B$629.7M—$4.39B$5.35B—$865.5M—$17.64B
Jan 14, 2026$8.08B$588.3M—$4.63B$6.19B—$890.9M—$20.37B
Jan 13, 2026$8.40B$447.3M—$4.96B$6.39B—$1.06B—$21.26B
Jan 12, 2026$6.59B$369.4M—$4.11B$5.36B—$909.3M—$17.34B
Jan 11, 2026$2.84B$149.8M—$1.68B$1.78B—$577.5M—$7.03B
Jan 10, 2026$1.37B$66.4M—$1.52B$1.45B—$419.8M—$4.83B
Jan 9, 2026$6.84B$286.2M—$3.97B$4.84B—$898.1M—$16.84B
Jan 8, 2026$7.05B$380.9M—$4.56B$5.39B—$884.9M—$18.26B
Jan 7, 2026$6.00B$300.7M—$4.47B$5.74B—$908.7M—$17.41B
Jan 6, 2026$7.79B$293.7M—$5.22B$6.02B—$895.5M—$20.22B
Jan 5, 2026$7.10B——$5.63B$6.04B—$694.6M—$19.47B
Jan 4, 2026$3.38B——$3.24B$3.27B—$646.0M—$10.53B
Jan 3, 2026$3.13B——$2.75B$2.16B—$577.1M—$8.62B
Jan 2, 2026$6.67B——$4.62B$4.43B—$717.5M—$16.43B
Jan 1, 2026$2.14B——$2.08B$1.74B—$375.6M—$6.33B
Dec 31, 2025$3.03B——$3.10B$3.16B—$585.6M—$9.87B
Dec 30, 2025$3.70B——$3.33B$3.85B—$582.6M—$11.46B
Dec 29, 2025$6.58B——$4.19B$5.02B—$605.2M—$16.40B
Dec 28, 2025$1.80B——$2.46B$1.64B—$321.5M—$6.22B
Dec 27, 2025$1.28B——$2.08B$1.44B—$263.5M—$5.06B
Dec 26, 2025$4.61B——$4.30B$3.76B—$541.6M—$13.21B
Dec 25, 2025$2.35B——$4.41B$2.11B—$533.9M—$9.40B
Dec 24, 2025$3.32B——$4.38B$2.73B—$508.5M—$10.94B
Dec 23, 2025$5.06B——$5.25B$4.02B—$620.6M—$14.95B
Dec 22, 2025$5.96B——$5.08B$5.00B—$606.9M—$16.65B
Dec 21, 2025$2.36B——$3.80B$3.11B—$521.8M—$9.79B
Dec 20, 2025$1.53B——$2.80B$2.10B—$223.8M—$6.65B
Dec 19, 2025$6.95B——$5.12B$6.51B—$540.6M—$19.12B
Dec 18, 2025$8.11B——$6.75B$7.86B—$621.1M—$23.34B
Dec 17, 2025$7.65B——$6.57B$7.53B—$685.5M—$22.43B
Dec 16, 2025$5.08B——$6.53B$6.76B—$628.2M—$19.00B
Dec 15, 2025$7.35B——$7.12B$8.95B—$850.8M—$24.27B
Dec 14, 2025$3.09B——$4.41B$5.07B—$745.4M—$13.32B
Dec 13, 2025$1.39B——$3.75B$2.92B—$318.2M—$8.38B
Dec 12, 2025$5.79B——$6.86B$6.99B—$696.1M—$20.34B
Dec 11, 2025$7.69B——$7.28B$7.87B—$706.3M—$23.54B
Dec 10, 2025$7.86B——$6.28B$6.48B—$835.6M—$21.46B
Dec 9, 2025$8.33B——$7.46B$7.50B—$746.9M—$24.03B
Dec 8, 2025$5.93B——$6.89B$5.60B—$662.9M—$19.09B
Dec 7, 2025$5.95B——$6.91B$6.28B—$764.8M—$19.91B
Dec 6, 2025$2.26B——$4.65B$3.37B—$333.2M—$10.62B
Dec 5, 2025$6.95B——$8.38B$9.72B—$669.4M—$25.72B
Dec 4, 2025$5.69B——$7.93B$7.23B—$621.5M—$21.47B
Dec 3, 2025$6.82B——$8.90B$7.82B—$726.8M—$24.26B
Dec 2, 2025$7.47B——$9.58B$9.24B—$734.0M—$27.03B
Dec 1, 2025$9.93B——$9.52B$10.74B—$671.1M—$30.87B
Nov 30, 2025$2.54B——$6.55B$3.82B—$467.1M—$13.38B
Nov 29, 2025$2.68B——$6.21B$3.14B—$516.3M—$12.54B
Nov 28, 2025$5.14B——$8.63B$6.29B—$807.4M—$20.87B
Nov 27, 2025$4.42B——$8.24B$5.46B—$247.4M—$18.37B
Nov 26, 2025$6.75B——$7.69B$8.34B—$536.0M—$23.32B
Nov 25, 2025$7.44B——$7.96B$6.43B—$747.2M—$22.58B
Nov 24, 2025$9.32B——$8.10B$8.16B—$1.13B—$26.70B
Nov 23, 2025$6.09B——$6.56B$4.74B—$893.7M—$18.29B
Nov 22, 2025$4.46B——$6.09B$3.79B—$482.3M—$14.83B
Nov 21, 2025$15.29B——$10.99B$14.25B—$1.49B—$42.02B
Nov 20, 2025$10.29B——$9.20B$11.10B—$724.2M—$31.32B
Nov 19, 2025$9.41B——$9.21B$10.29B—$695.4M—$29.61B
Nov 18, 2025$9.54B——$9.75B$8.48B—$641.7M—$28.42B
Nov 17, 2025$9.43B——$8.71B$8.96B—$705.1M—$27.80B
Nov 16, 2025$6.83B——$7.48B$8.83B—$897.3M—$24.04B
Nov 15, 2025$4.48B——$6.78B$5.35B—$464.8M—$17.07B
Nov 14, 2025$13.24B——$11.65B$11.82B—$1.37B—$38.07B
Nov 13, 2025$12.78B——$11.05B$11.05B—$1.18B—$36.06B
Nov 12, 2025$7.45B——$9.94B$7.41B—$731.4M—$25.54B
Nov 11, 2025$9.00B——$9.28B$7.55B—$890.9M—$26.73B
Nov 10, 2025$8.41B——$9.33B$4.95B—$951.2M—$23.64B
Nov 9, 2025$5.92B——$7.76B$11.23B—$591.1M—$25.49B
Nov 8, 2025$5.33B——$6.57B$8.19B—$643.0M—$20.73B
Nov 7, 2025$11.14B——$10.06B$10.30B—$893.1M—$32.40B
Nov 6, 2025$9.71B——$8.27B$7.10B—$1.03B—$26.11B
Nov 5, 2025$8.72B——$7.87B$8.17B—$923.0M—$25.68B
Nov 4, 2025$18.18B——$14.20B$11.99B—$1.10B—$45.48B
Nov 3, 2025$11.93B——$11.59B$11.10B—$821.6M—$35.44B
Nov 2, 2025$3.86B——$8.57B$15.22B—$378.9M—$28.03B
Nov 1, 2025$2.68B——$5.75B$5.74B—$406.7M—$14.57B
Oct 31, 2025$6.95B——$8.61B$9.55B—$936.4M—$26.05B
Oct 30, 2025$11.86B——$9.96B$12.49B—$1.41B—$35.73B
Oct 29, 2025$10.60B——$10.07B$10.55B—$795.4M—$32.02B
Oct 28, 2025$9.42B——$10.68B$10.27B—$786.8M—$31.15B
Oct 27, 2025$8.02B——$11.19B$7.32B—$781.8M—$27.31B
Oct 26, 2025$5.97B——$8.00B$11.27B—$684.6M—$25.93B
Oct 25, 2025$2.99B——$5.65B$7.26B—$353.3M—$16.25B

Questions about these charts

Where do the daily figures come from?

From 18 Sep 2026, from each exchange's own API, read every minute; a day is its figure at 00:00 UTC. Before that, daily volume is the sum of each exchange's daily candles (markets delisted since are missing), and open interest and TVL are DefiLlama's, the open interest scaled to the exchange's own figure.

Why do older days have no share of DEX volume?

A day carries a share only when every DEX with 1% or more of DEX volume now has a figure for it. Before the younger exchanges' histories start the total is too small and every share would read too high, so those days are left empty.

What is the cost to trade?

The taker fee both ways plus the order-book slippage of a market buy and a market sell of the size from the mid, on that day's median order book. Per exchange it is the median of its markets, weighted by each market's volume that day, with at least 3 markets; the fee is today's where its history is not known. With an asset picked, it is that asset's largest market on each exchange instead of the median.

How is the vault return worked out?

The change in each pool's share price over 30 days (a pool without one gets a price built from its equity and profit, so deposits do not count as return), weighted by the pools' TVL. It is not annualised and it is not the exchange's own APR.

Where do fees and revenue come from?

From DefiLlama, each exchange's perps listing only, so spot trading is not in them; DefiLlama revises past days and the whole series is read again every night. Hyperliquid's fees include its HIP-3 markets, which its volume here does not, so fees per volume reads high for it.

What can a formula do?

Combine the metric names (vol, oi, tvl, share, share_oi, mkts, vtvl, vret30, cost10k, cost100k, cost1m, fees, rev) with + − * / ^ and brackets, and the functions ma, sum, chg, lag, cum, abs, log, min and max. It is worked out per exchange and day, and a day with a missing figure stays a gap.

What is day 0?

With “Since launch” the chart counts days from each exchange's own day 0 instead of dates, so exchanges launched years apart start side by side: day 0 is its launch day, a day you pick for it (Own date), or the first day its 7-day average reached a size (First $X). Day 90 is the 90th day after each one's day 0, a different date for each; the hover gives that date.

Why does a line start after day 0?

Our daily figures for that exchange start later than its day 0: before the collector started, a history goes back as far as the exchange's own daily candles and DefiLlama reach. Nothing is filled in before the first figure, and a day without a figure stays a gap. The legend says from which day a line starts and how many days it is missing.

What counts as reaching $100M?

The 7-day average of the metric, taken over at least 3 days with a figure, at or above the size for the first time. An exchange that was already above it on the first day it has an average is not drawn from there, because the day it got there is not known; in the days to milestones it shows as “≤ N”.